Arabic

|

Chinese

|

Deutsch

|

Español

|

Français

|

Italiano

|

Português

|

Russian

|

English

Search

 
Home
Products
Training
Information
News
Client Access
International
Site Map
Projects
Contact
 
Clients

  Home > News > Baku-Tbilisi-Ceyhan (BTC) 1,770 km long Main Oil Pipeline
 

March 2003

1,770 km long Baku-Tbilisi-Ceyhan (BTC) Main Oil Pipeline:

AIOC awards ATMOSi the Supply of Two Different Leak detection systems ATMOSTM Pipe leak detection systems and the training simulator.

 

ATMOSTM Pipe leak detection systems & ATMOSTM HAL liquid/hydraulic training simulator (with Hydraulic Analysis Ltd) is current under design.

BTC MOL

 

The 1,770 km long Baku-Tbilisi-Ceyhan (BTC) pipeline would, starting in 2005, transport up to one million barrels per day (bpd) - 50 million tons per annum - of crude oil from an expanded Sangachal terminal near Baku in Azerbaijan, through Georgia to a new marine terminal at Ceyhan in Turkey on the Mediterranean coast.

 

The Baku-Tbilisi-Ceyhan main export oil pipeline, which, along with the Baku-Tbilisi-Erzrum pipeline, is intended to connect the Caspian Sea coast to the Turkish Mediterranean in order to provide oil and gas for European markets. The project is led by Azerbaijan International Oil Company (AIOC), which is led by British Petroleum Amoco (BP).

[Pipeline Leak Detection Systems]  [Pipeline Integrity Management]  [Pipeline Simulation]  [Leak Location] 
COPYRIGHT 2005 ATMOS - USA +1 - (714) 520 LEAK (5325,) UK +44 (0)161 445 8080 ALL RIGHTS RESERVED