March 2003
ATMOSTM Pipe leak detection system and ATMOSTM GSIM Operational on the Largest Subsea Gas Pipeline in Asia 504 km subsea
ATMOSTM Pipe & ATMOSTM GSIM has completed it’s first year installation on the Malampaya Pipeline System for SHELL Philippines.

Malampaya Deep Water Gas to Power Project is a landmark undertaking of the Philippine government and Shell. To monitor and manage the pipelines effectively, Malampaya has selected both ATMOSTM Pipe & ATMOSTM GSIM.
ATMOSTM GSIM is a hydraulic modelling software based on many years of research and development. It simulates the flow, pressure and temperature along the 24”, 504 KM long offshore and the 10 KM long onshore pipelines at 10 second intervals. In addition, look ahead modelling, survival time calculations and under/over pressure alarms are provided.
|